The brief for Newham College was to analyse the current customer flow and rethink this to help ease congestion during lunch time. They required a new lease of life into the tired servery, combining bold colours to tie into the college’s branding.
In an effort to reduce costs, we utilised the existing front servery counter, recladding this to help modernise the look and feel of them. A new Grab & Go station was proposed, to help ease the queueing and allow student to easily grab a snack and drink during breaks.
Furthermore, the existing pod was also given a make over, with the same finishes and planters being added to the exterior which tied all the servery areas together.
The result, a cohesive rebrand which allow users to easily access food options during breaks, all whilst providing the client with a refurbishment which keeps costs lower whilst creating a full transformation of the spaces.
Wanna get in touch? Let's talk
Project Details
- Summer 2025
- Sixth Form Grab and Go, Refurbished Servery and Pod
- Full Turnkey project
Before and After
BEFORE












